KRJ - 7500 Industrial Automation Integrated Training Device
Product Overview: This device sets microcontroller, programmable logic controller (PLC), Frequency Control, touch screen, integrated AC servo, modules linked boxes portfolio design, rational structure, multifunctional experimental convenience. The device hardware, software fully equipped, each aircraft can conduct real gymnastics training alone, but also can be programmable controller (PLC), the combination of VVVF functional experiments. Students comprehensive and systematic master microcontroller, programmable logic controller (PLC), the structure VVVF principle, programming skills, portfolio allocation, integrated applications, the installation operation and inspection and maintenance.
To meet the various institutions laboratory building needs, we have introduced a "KRJ - 5800 network-based Integrated Training PLC senior electrician examination device." It combines programmable logic controllers, programming software, PLC LAN, MCGS Control Software, electric drive, process control automation is one. This device can be directly carried out the basic instructions PLC practice, a number of practical applications PLC and physical simulation experiment, all experiments were conducted Dynamic Configuration bar graph tracking devices installed in the mainframe using FX2N - 48MR can be made process controller.
Product Overview: This device sets microcontroller, programmable logic controller (PLC), Frequency Control, touch screen, integrated AC servo, modules linked boxes portfolio design, rational structure, multifunctional experimental convenience. The device hardware, software fully equipped, each aircraft can conduct real gymnastics training alone, but also can be programmable controller (PLC), the combination of VVVF functional experiments. Students comprehensive and systematic master microcontroller, programmable logic controller (PLC), the structure VVVF principle, programming skills, portfolio allocation, integrated applications, the installation operation and inspection and maintenance.
To meet the various institutions laboratory building needs, we have introduced a "KRJ - 5800 network-based Integrated Training PLC senior electrician examination device." It combines programmable logic controllers, programming software, PLC LAN, MCGS Control Software, electric drive, process control automation is one. This device can be directly carried out the basic instructions PLC practice, a number of practical applications PLC and physical simulation experiment, all experiments were conducted Dynamic Configuration bar graph tracking devices installed in the mainframe using FX2N - 48MR can be made process controller.
Features of the product mix
1, the experimental table: Set of two, the main structure for plastic-steel and wood structure, the main material used melamine posted double-sided boards, desktop boards using 25 mm density panels, plaster imported fire board (made of duck Qichen) . Its cross section using high-temperature hot melt adhesive PVC Edge with Edge. Operating desk drawer for two, to facilitate storage of wire is speaking guide books, tables set up beneath the cell plate cupboard, convenience store experiment module board.
2, the experimental screen: spray-painted plastic-steel structure, fixed on the operation platform, power-screen control panel beneath the experimental design; above the central window style guide for the design of the experimental modules can be freely working in the rail, the right design for the top programmer templates to facilitate mate. The experimental screen pleasing in appearance, strong solid, anti-rust resistance dust, and easy to use.
3, power control panel: Power Console panel is equipped with a belt-leakage protection circuit breaker for emergency cases, the circuit breaker tripping, troubleshooting, will be reset button leakage can be re-used.
4, unit plate: The ABS plastic, a plastic injection molding, back and containing circuit boards can be installed and components.
5, experimental Traverse: All plug connecting lines have adopted security plug-again and again, providing students with experimental high security.
6, test-bed five-wire system using three-phase power supply for the experiment to provide a safe and reliable power supply. Therefore, the equipment can be upgraded to do after VVVF experiment.
1, the experimental table: Set of two, the main structure for plastic-steel and wood structure, the main material used melamine posted double-sided boards, desktop boards using 25 mm density panels, plaster imported fire board (made of duck Qichen) . Its cross section using high-temperature hot melt adhesive PVC Edge with Edge. Operating desk drawer for two, to facilitate storage of wire is speaking guide books, tables set up beneath the cell plate cupboard, convenience store experiment module board.
2, the experimental screen: spray-painted plastic-steel structure, fixed on the operation platform, power-screen control panel beneath the experimental design; above the central window style guide for the design of the experimental modules can be freely working in the rail, the right design for the top programmer templates to facilitate mate. The experimental screen pleasing in appearance, strong solid, anti-rust resistance dust, and easy to use.
3, power control panel: Power Console panel is equipped with a belt-leakage protection circuit breaker for emergency cases, the circuit breaker tripping, troubleshooting, will be reset button leakage can be re-used.
4, unit plate: The ABS plastic, a plastic injection molding, back and containing circuit boards can be installed and components.
5, experimental Traverse: All plug connecting lines have adopted security plug-again and again, providing students with experimental high security.
6, test-bed five-wire system using three-phase power supply for the experiment to provide a safe and reliable power supply. Therefore, the equipment can be upgraded to do after VVVF experiment.
Main Specifications
1, input supply: AC380V ± 10% (3-Phase V line) 50 HZ;
2, rated current: <10 A
3, ambient temperature: -10 ° C -40 ° C
4, relative humidity: <95% (25 ° C)
5, Mitsubishi hardware: FX2N - 48MR
6, appearance size: 1600 x 700 x 14.5 (mm)
1, input supply: AC380V ± 10% (3-Phase V line) 50 HZ;
2, rated current: <10 A
3, ambient temperature: -10 ° C -40 ° C
4, relative humidity: <95% (25 ° C)
5, Mitsubishi hardware: FX2N - 48MR
6, appearance size: 1600 x 700 x 14.5 (mm)
Performance characteristics
1, the experimental device not only can do the conventional PLC experimental, but also can be done PLC communications experiment.
2, open the MCGS IPC configuration software programming environment, any experiment can edit a visual image, animated strong, good teaching results configuration rod map, dynamic tracking and experimental teaching. For help MCGS IPC configuration software, teachers can monitor the test-bed of experimental conditions.
3, the experimental teaching laboratory LAN
Through 485 can be carried out by all laboratories PLC linking it to a laboratory PLC LAN, which can carry out PLC Network teaching experiment.
4, experimental system consists of the following components, which:
1), PLC programmable logic controller test-bed
2), PLC programmable logic controller demonstration device
3), PLC programmable logic controller operating table
4), Application Programming Software
5), PLC and relay communications cables or manual controller
6), the configuration software and configuration experimental procedure
7), PLC LAN
1, the experimental device not only can do the conventional PLC experimental, but also can be done PLC communications experiment.
2, open the MCGS IPC configuration software programming environment, any experiment can edit a visual image, animated strong, good teaching results configuration rod map, dynamic tracking and experimental teaching. For help MCGS IPC configuration software, teachers can monitor the test-bed of experimental conditions.
3, the experimental teaching laboratory LAN
Through 485 can be carried out by all laboratories PLC linking it to a laboratory PLC LAN, which can carry out PLC Network teaching experiment.
4, experimental system consists of the following components, which:
1), PLC programmable logic controller test-bed
2), PLC programmable logic controller demonstration device
3), PLC programmable logic controller operating table
4), Application Programming Software
5), PLC and relay communications cables or manual controller
6), the configuration software and configuration experimental procedure
7), PLC LAN
Programmable pilot project
1, the implementation of unit
AC contactor, thermal relays, power controller, trip switches, output movements, three-phase asynchronous motors, components commonly used, conventional (such as six machine circuit) and the special procedural requirements for the various circuits (such as manipulator control or process control).
2, Training modules
1), and, or, non-functional logic Training
2), timers, counters function Training
3), fully automatic washing machines and Training Demonstration
4), electroplating production line control Training and Demonstration
5), stepper motor shows and Training
6), and the traffic lights-controlled demonstration and Training manual
7), motor control demonstration and Training
8), demonstrating the light tower Training
9), automatic feeding Loading System Training
10), controlled rolling machine Training
11), water level control towers Training
12), Automatic Machine Training
13), a variety of Liquid Control Training
14), mail sorting machine Training
15), four Elevator Control Training Demonstration
16), has been edited by Rod map configuration of any of the above dynamic tracking experimental teaching experiment
17), in view of the specific requirements of the pilot project, students self-configuration bar graph editing, teaching experiment
18), teacher-computer (main station) mainframe with 32 PLC (from the stands) for direct communication experiments
工业自动化综合实训装置
1, the implementation of unit
AC contactor, thermal relays, power controller, trip switches, output movements, three-phase asynchronous motors, components commonly used, conventional (such as six machine circuit) and the special procedural requirements for the various circuits (such as manipulator control or process control).
2, Training modules
1), and, or, non-functional logic Training
2), timers, counters function Training
3), fully automatic washing machines and Training Demonstration
4), electroplating production line control Training and Demonstration
5), stepper motor shows and Training
6), and the traffic lights-controlled demonstration and Training manual
7), motor control demonstration and Training
8), demonstrating the light tower Training
9), automatic feeding Loading System Training
10), controlled rolling machine Training
11), water level control towers Training
12), Automatic Machine Training
13), a variety of Liquid Control Training
14), mail sorting machine Training
15), four Elevator Control Training Demonstration
16), has been edited by Rod map configuration of any of the above dynamic tracking experimental teaching experiment
17), in view of the specific requirements of the pilot project, students self-configuration bar graph editing, teaching experiment
18), teacher-computer (main station) mainframe with 32 PLC (from the stands) for direct communication experiments
工业自动化综合实训装置
SHANGHAI KERONG TEACHING APPARATUS CO.,LTD
English Tel: +86.21-56301098 Fax: +86.21-66613899
QQ: MSN:shkr123@hotmail.com
Website: www.shkr.com Email: kerong@shkr.com
English Tel: +86.21-56301098 Fax: +86.21-66613899
QQ: MSN:shkr123@hotmail.com
Website: www.shkr.com Email: kerong@shkr.com